Power projects of jammu and kashmir.

 

 Power (energy resources of kashmir). 

 Important topic for J&K Exams. jkssb , jkpsc




Jammu and Kashmir has abundant water resources and great potential for hydro power, estimated at over 20000MW

Of This only 10% has been exploited and efforts are being made to effectively to tap and harness the untapped hydro power potential of UT. 

Despite the significant potential of hydro power and its benefits , it has still not been harnessed in a meaningful way due to   long gestation periods for hydro  power    projects ,     Unavailability of reliable hydrological data under projects offered , skewed tariff profile ,  instability in the political environment of   jammu    and     kashmir     and remoteness  from large consumption centers.

Important Hydel Power projects in J&k and Ladakh 

Baglihar Dam :- It is a 900 MW hydropower project on the chenab river in Doda district. The first phase of Bhaglihar Dam was completed in 2004. The second phase was inaugurated by prime minister Manmohan Singh on 10 October 2008.the project's estimated is 1 billion Dollars. 

______________________________________

Salal Hydel Power Project :- It is a 690 MW hydel power project on the chenab river in Reasi District. Salal project is operated and maintained by NHPC. Power from this project is transmitted to Northern Grid. 

______________________________________

Dul Hasti :- it is 390 MW power project hydroelectric power project on the chenab river in Kistiwar District. It was constructed between 1985 to 2007. The project provides peaking power to Northern Grid. 

______________________________________

Chutak Hydel Power Project :-  it is a 44 MW hydroelectric power project on the suru River (a tributary of River InDus in kargil District of Ladakh. The project will be connected to northern grid by 220 KV transmission Srinagar Leh Line. 

______________________________________

Kishan Ganga Hydel Power Project :- kishan ganga hydel power project  is a part of run of a river scheme that is designed to divert water from kishan ganga to a power plant in river basin of jehlum. It is located in Baramulla district and will have installed capacity of 330 MW. Construction on project begin in 2007 and is expected to complete soon . Construction on the Dam was halted by the hauge's permanent court of Arbritation in October 2011 due to pakistan's protect of its effect on the flow of kishanganga river. In February 2013 Hauge ruled that india could divert  minimum amount of water for power generation. 

______________________________________

URI Dam :- it is a 480 MW hydroelctric power station on the jehlum river near uri in Baramulla district. The station is largely built under a hill with a 10 km tunnel .  The project was awarded to be an European consortium called URi Civil. It was partially funded by Swadesh and British Government. URI 2 project was inaugurated on july 4,2014.

______________________________________

Ratle Power Plant :- it is a 850 MW hydroelectric power station under construction on chenab river , downstream of the village of Ratle in Doda district. The foundation stone for the project was laid down in 25 june, 2013 by the prime minister Manmohan singh . The project is expected to complete soon by gov of india.

______________________________________

Nimoo Buzgo power project :- its a 45 MW hydroelectric power project on the indus river situated at village Alchi 70km from Ladakh. The project was inaugurated on August 12 2014 by prime minister Mannohan singh. 

________________________________

Pakal DuL Dam:- it is a concrete facerock fill Dam on the Marusadar River  ,  a tributary of chenab river in kistiwar district . The primary power of this Dam is hydroelectric power Generation. 